DOWNLOADS
Permohonan Cadangan Syarikat Baru (Terkini)
TEMPLATES |
|
LTR01 |
Application Letter (English) |
SKE-LP1A |
Reply Form from the company* |
LTR03 |
Sample CV (Resume) |
Attention
|
* LTR02 and LTR03 (Resume) must be submitted to the company together with the application letter (LTR01)
|
|
|
FORMS |
|
FKE-LP1(2009) |
Maklumat Peribadi
(Equivalent to registration in ITS)
|
SKE-LP2 (2022) |
Maklumat Penempatan Latihan Industri
(Industrial Training Placement Information)
|
SKE-LP2A(2022) |
Maklumat Penempatan Latihan Industri
(Industrial Training Placement Information)
|
SKE-LP3 (2022) |
Jadual Kerja Latihan Industri
(Industrial Training Schedule) |
SKE-LP4 (2022) |
Laporan Kemajuan Latihan Industri
(Progress Report - Evaluated by Industrial Supervisor) |
SKE-LP4A (2022) |
Pengesahan Buku Log
(Logbook Endorsement - Endorsed by Industrial Supervisor)
|
SKE-LP5 (2022) |
Penilaian Latihan Industri
(Industrial Training Visit Evaluation) |
SKE-LP6 (2022) |
Penilaian Laporan Latihan Industri
(Industrial Training Report Evaluation) |
SKE-LP7 (2022) |
Maklumbalas Pelajar Selepas Latihan
(Trainees Feedback Form)
|
|
|
|
|
MISCELLANEOUS |
|
GARIS PANDUAN
|
Garis Panduan Latihan Industri UTM
(UTM Industrial Training Guidelines)
|
MS01 |
Prosidur Perancangan LI
(Industrial Training Planning Procedures)
|
MS02 |
Taklimat Awal
(First LI Briefing : 05 December 2017)
|
MS03 |
Taklimat Akhir
(Final Briefing : 22 May 2018)
|
SKE LP2 2017 |
Status Penerimaan Salinan Asal Borang LP2 sehingga 18 June 2017
(Status Receipt of Original LP2 Form as of 18 June 2017)
|
MS05 |
Prosidur Lawatan Penyelia FKE
(Visiting Procedures for FKE Faculty Supervisor)
|
MS06 |
Format Penulisan Laporan Industri - Manual Thesis UTM 2015
(Industrial Training Report - Format for Paging, Paragraph, Structure etc.) |
Declaration Form |
Declaration Form
(Declaration Of Undergraduate Industrial Training Report And Copyright ) |
|